2021/34 “Upstream Dams Threaten the Economy and the Security of the Mekong Region” by Murray Hiebert

This photo taken on February 8, 2020 shows fishermen laying their nets on the Mekong River near Luang Prabang close to the site of an approved Laos dam site. Environmentalists have criticised Laos for pressing ahead with plans for another “destructive dam” on the Mekong River, a waterway already strangled by hydropower schemes. Photo: Aidan JONES, AFP.

EXECUTIVE SUMMARY

  • China’s 11 hydropower dams built on the upper Mekong River held back massive quantities of water over the last two years, causing crop failure and depleting fish catches, and threatening the livelihoods of the 60 million people living downstream: a) Recent storage of massive amounts of water behind these dams has starved Tonle Sap Lake of water and devastated Cambodia’s most fertile fish-spawning area; b) China’s upstream dams hold back water and silt which threaten the Mekong Delta, Vietnam’s most fertile rice-producing region with inundation by saltwater from the South China Sea.
  • China has financed half of Laos’ 60 dams on Mekong tributaries and two more on the mainstream. This has helped push the landlocked country’s debt levels to about $17 billion in 2019, nearly equivalent to the country’s annual GDP. In 2020, difficulties servicing this debt caused the Lao government to turn over a giant chunk of its electricity distribution company to a Chinese state-owned power grid firm.
  • Beijing has long pressed to send large cargo vessels down the Mekong deep into Lao and Thai territory. To make this work would require blowing up massive rocks in the river, which Thai environmentalists have objected to. Bangkok initially put China’s project proposal on hold, but later cancelled it out of concern that it would give Beijing too much strategic and economic influence deep into mainland Southeast Asia.

* Guest writer, Murray Hiebert, is the author of Under Beijing’s Shadow: Southeast Asia’s China Challenge, published in August 2020, from which this article is adapted. He is Senior Associate at the Center for Strategic and International Studies in Washington, DC.

INTRODUCTION

The drought that struck during the 2019 rainy season, when the Mekong River hit its lowest levels in half a century, ravaged the livelihoods of farmers and fishers living along the lower Mekong countries of Laos, Thailand, Cambodia and Vietnam. Initially, it was widely thought that the sharply reduced levels of water were primarily due to unusually low rainfall caused by an El Nino weather system.

Only in April 2020 did these nations learn the key cause of drought when a U.S. research company released satellite images that showed dams on the upper reaches of the Mekong in China holding back large quantities of water at a time when its southern neighbors were facing devastating shortages.[1] China had said that it was encountering low levels of rain itself when in fact it was blessed with higher-than-normal levels of water upstream along the 4,300-kilometre river.

China denied the findings of the Eyes on the Earth and seemingly did little, if anything, to release water from the reservoirs of its dams, resulting in a second devastating drought in the lower Mekong in 2020. This two-year drought, which resulted at times in the river’s water level being three meters lower than normal at the river gauge in Thailand nearest to China’s border, wreaked havoc on the livelihoods of the 60 million people living along or near the lower Mekong.

Beijing’s financing and constructing of dams in Laos have also had an economic impact. The debt burden of Laos’ state-owned utility Electricite du Laos (EDL) in 2020 reached about $8 billion, nearly 50 percent of Laos’ GDP.[2] The sharp decrease of government revenue in the wake of the Covid-19 pandemic made it more difficult to service the company’s debt, prompting Laos to spin off part of EDL into a new entity in which a Chinese power grid firm took a giant stake.[3] This marked the first known case in Southeast Asia in which a country fell into a “debt trap” with China and had to turn over a stake in a key company to service the country’s loans.

Since the Mekong is so vital to economic life in mainland Southeast Asia and western China, analysts have begun viewing the river as the possible next hot spot between Beijing and its southern neighbours, much like the South China Sea has become. This has prompted the United States to call out some of China’s actions and join Japan and Australia in providing various types of aid and capacity building to the lower Mekong nations.

THE ENVIRONMENTAL IMPACT

China has built 11 hydropower dams on its section of the world’s 12th longest river that have the combined capacity to store as much water as the Chesapeake Bay in the United States, or about 18 trillion gallons of water.[4] Nine others are on the drawing board. Chinese conglomerates are also in various stages of planning to finance and/or construct about half of 11 dams planned for the mainstream of the river in Laos and Cambodia. The dams in these two countries will have an even bigger impact than those in China because the Mekong in these countries provides roughly four-fifths of the water and sediment downstream.

The dams built or funded by China are creating apprehension downstream. They will not only impact the water flow, but also restrict the movement of fish and diminish the flow of sediment which farmers and fishers depend on along the lower Mekong. During the dry season, more than 40 percent of the water in the Mekong comes from melting glaciers and water runoff in China’s portion of the river which begins in the snow-covered mountains of Tibet.[5]

Water from China is vital to rice production in the downstream countries of Laos, Thailand, Cambodia and Vietnam, especially during times of limited rainfall. This is particularly true in southern Vietnam’s Mekong Delta, which grows half the country’s rice and nearly three quarters of its fruits and vegetables. Freshwater from China helps this low-lying region against invasion of saltwater from the South China Sea. Rice production in Thailand and Vietnam, two of the world’s largest exporters, fell sharply in 2019 and 2020.[6]

Sediment carried by the river, about half of which comes from China, has also long been critical for protecting the Mekong Delta against intrusion by the sea. But much of the silt is now blocked by the dams, which do not have effective sediment flushing systems. The quantity of suspended sediment dropped to 10 metric tons in 2009 from 60 metric tons in 2003 in Chiang Saen in northern Thailand[7] and is expected to block some 96 percent of all sediment if all the dams currently proposed are built.[8] The loss of sediment is also starving the banks along the river and the Mekong region of the nutrients needed for crop production, causing billions of dollars in losses.[9]

China’s dams also block fish migration between the upper and lower regions of the river, which hampers spawning and causes a sharp drop in fish stocks downstream. This decline of fish movement will cause losses to China’s southern neighbours of over $16 billion in the years until 2042.[10]

LAOS IN A “DEBT TRAP?”

Laos has built 60 hydropower dams on the Mekong’s tributaries and two on the mainstream to fire up the landlocked and mountainous nation’s economy. Vientiane is planning up to eight more on the mainstream despite complaints by Thailand and Vietnam about the environmental impact to their countries. Most of the Lao-produced electricity is exported to Thailand, where demand has dropped sharply in the wake of the pandemic.

China has financed and/or built about half the dams along the Mekong and its tributaries. The Export-Import Bank of China and China Development Bank have provided billions of dollars in loans for the dams in Laos, and companies such as Sinohydro Corporation and Power China Resources have constructed many of the barrages.

Vientiane’s plans for hydropower dams have created tensions with its neighbours downstream. Before building the $3.5 billion Xayaburi Dam, Laos’ first on the mainstream, the government in 2011 promised to consult with its neighbours under a process set up by the Mekong River Commission, an inter-government organisation designed to promote sustainable development and joint management of the river. But the next year, Laos signed a contract with a Thai firm and began construction, despite objections from Vietnam.[11]

A similar situation developed around the Don Sahong Dam near the Cambodian border. Laos had agreed with its neighbours to perform an impact study before starting construction, but two months later Vientiane announced that construction would begin. Thailand, Cambodia and Vietnam requested more time to complete the study, but Laos pushed ahead with construction.

A number of Lao plans for dams began facing strong opposition from civil society organisations and villagers in Thailand, which is purchasing much of the electricity Laos is producing. These groups protested the impact of the dams on the migration of fish and the flow of sediment downstream. The Thai government has deferred a decision to sign a power purchase agreement for the output of the planned Pak Beng Dam on realising that it had overestimated the nation’s electricity needs until 2036.[12]

Laos is determined to press ahead, even though its external debt – much of it related to loans from China for dams – is becoming unsustainable. Laos’ foreign obligations by 2019 had reached nearly $17 billion, slightly less than the country’s GDP, of which a little over $10 billion were public and publicly guaranteed debt. China accounted for nearly half of all Lao external debt.[13] The debt of EDL, which played a vital role in many of the hydropower projects, stood at roughly $8 billion, over 40 percent of GDP.[14]

In September 2020, Laos created a new company out of EDL, calling it EDL Transmission Company (EDL-T), which would be responsible for the country’s domestic electricity transmission grid. It then turned over a roughly 90 percent stake in the new company to a Chinese state-owned firm, China Southern Power Grid Co. Ltd. How much the firm paid for its stake has not been made public nor is it clear if the newly formed company will take on some of the Lao government debt. EDL officials insist that the transaction has not resulted in a loss of sovereignty because, they say, the Chinese firm is a professionally run utility company.[15]

The following month, EDL, still facing debt repayment pressures, sold roughly a quarter of its shares on the Lao Securities Exchange in EDL-Generation Public Company to a prominent Lao construction firm active in the energy sector.[16] The Lao government reportedly is considering selling a separate stake in the Nam Ngum 3 hydropower project to other investors, possibly including China Southern Power, a company from Thailand and another from Laos.[17]

FISH MIGRATION THREATENED

About half of Cambodia’s population makes its living farming on the floodplains created by the Mekong and its tributary the Tonle Sap, or fishing along the two rivers.[18] When the yearly monsoon rains begin around May massive quantities of water flow up the Tonle Sap and expand by roughly fivefold the dry-season size of Tonle Sap Lake. As the rains subside towards the end of the year, Tonle Sap River reverses course and drains the lake’s water back into the Mekong.

This annual cycle plays a critical role in the migration and spawning of fish, a process that has been severely impacted by the recent droughts and the holding back of water behind China’s upstream dams. Fishers along the Tonle Sap, the world’s largest inland source of fish which supplies around three-quarters of the country’s protein, reported that their catches in 2019 were down some 80 percent or more.[19]

China is also a major investor in and builder of dams in Cambodia. The Lower Sesan 2 Dam, in which a Chinese company holds a majority stake, is projected to have an outsized impact on the environment. A U.S. environment organisation that did a study of the dam for the Cambodian government concluded that it is “the most destructive dam in the Mekong River basin.”[20] The dam, inaugurated in 2018, is expected to block the migration of fish, on which millions depend for their livelihoods.

Nearly 80,000 people living above the Lower Sesan 2 dam are expected to lose access to migratory fish on which they rely for their livelihoods.[21] But a larger population will be hit by losses of protein and sources of income because the dam will block the movement of fish between the Sesan and Srepok tributaries of the Mekong and the Tonle Sap to spawn.[22]

A 2012 study by the U.S. National Academy of Sciences found that over a million tons of freshwater fish were caught each year in the floodplains of Cambodia and Vietnam. The authors estimated that the population of fish would drop by 9.3 percent due to the Lower Sesan 2 Dam. They found that the Mekong had some 900 species of fish, over 100 of which would be affected by the dam blocking their migration patterns.[23]

Another dam, the Sambor, which was designed by China Southern Power Grid Co., would be even more “devastating” to migratory fish, according to a 2017 study by the U.S. National Heritage Institute. The authors reported that it would create a barrier that would make it impossible for fish to move from Tonle Sap Lake to spawning grounds upstream. The dam would block 60 percent of the suspended sediments that provide the food needed to sustain fish, and as many as 80 long-range migratory fish species would be “endangered” by the dam.[24]

THAILAND LIMITS CHINA’S SECURITY INFLUENCE

Decades ago, after Thailand abandoned building hydropower dams at home under pressure from civil society, it began looking to Laos to fill the energy void. Thai companies gave the Lao credit to build dams and its construction firms helped design and build many of them. But Bangkok began withdrawing support for Lao dams after one collapsed in southern Laos. Under pressure from civil society, Thailand delayed signing an agreement to buy electricity from the planned Pak Beng Dam after realizing that officials had overestimated the country’s power needs, and because the costs of producing wind and solar power had dropped sharply.

Beijing has long pressed to send large cargo vessels carrying up to 500 tons of goods down the Mekong from southern China at least as far south as Luang Prabang in Laos. But that would require dynamiting some gigantic rocks and dredging the river near Chiang Saen, which Thai environmentalists have vigorously opposed because it would affect the ecology of the river and harm food security for people along the river. Thai officials put the project on hold in 2017 and three years later cancelled it totally.[25]

After drug dealers killed 13 sailors during an attack on two cargo vessels in the Thai section of the Mekong a decade ago, China has been sending armed Chinese police boats down the Mekong through Myanmar and Laos about once a month. These boats travel to the Thai section of the river where they are met by Thai patrol boats before returning to China.[26] Beijing has pressed Bangkok to allow the Chinese patrol boats to go further but the Thais have pushed back out of concern that this would allow China to extent its economic and strategic reach deep into mainland Southeast Asia.

DAMS IMPERIL VIETNAM’S FERTILE MEKONG DELTA

The Mekong Delta in southern Vietnam, where about 22 million people live, supports some of the world’s richest farming areas. The low-lying plain, roughly the size of Denmark was created by mountains of silt from the river, some of which came from the Himalayas. The delta produces three rice crops a year, which has turned Vietnam into a major rice exporter. But the delta is barely above sea level and is vulnerable to the incursion of saltwater.

Because of the delta’s unique features, it is in a very vulnerable situation. The dams that the Chinese, Lao and Cambodians are building upstream block water, hold back silt and obstruct the movement of fish. The downstream countries have traditionally gotten about 40 percent of their water from the Chinese section of the river during the dry season and 18 percent during the rainy season, but those percentages have been reduced sharply by the dams upstream.[27]

Beyond 2020, the sediment that reaches the Mekong Delta in Vietnam is estimated to be only about one-third of the level in 2007.[28] The dams also block fish migration and are expected to cause a drop in fisheries income in the countries south of China of up to $22.6 billion over 24 years, according to a 2018 study.[29]

CONCLUSION

The physical, ecological and economic future of the Mekong is under threat from upstream dams. For the Mekong to remain healthy and survive will require that China and its Southeast Asian neighbours find ways to share the river’s water, fish and silt. This will also ensure that the Mekong does not become a security flashpoint like the South China Sea has become.

Beijing can help ease the threat of drought downstream by providing more information about how much water it is storing behind its dams and agreeing to release more water during the rainy season. This water is needed for farming downstream, but also to save the Tonle Sap’s fishing industry, and keep the Mekong Delta from being submerged under saltwater.

The international community, including the United States and Japan, can help landlocked Laos figure out how to build its economic future without constructing more costly, environmentally damaging hydropower dams. If Laos looked to solar and wind farms, its Thai and Vietnamese neighbours would be more inclined to buy more electricity from it to help drive their economies.

ISEAS Perspective 2021/34, 22 March 2021.


ENDNOTES

[1] Kay Johnson, Chinese Dams Held Back Mekong Waters During Drought, Study Finds, Reuters, 13 April 2020, https://www.reuters.com/article/us-mekong-river/chinese-dams-held-back-mekong-waters-during-drought-study-finds-idUSKCN21V0U7.

[2] John Reed, Laos Faces Sovereign Default As Forex Reserves Dip Below $1 Billion, Financial Times, 3 September 2020, https://www.ft.com/content/dc3f5981-4fd9-4e3a-9824-5b9ddf70735e.

[3] Keith Zhao and Kay Johnson, Taking Power – Chinese Firm to Run Laos Electric Grid Amid Default Warnings, Reuters, 15 September 2020, https://www.reuters.com/article/china-laos/exclusive-taking-power-chinese-firm-to-run-laos-electric-grid-amid-default-warnings-idUSKBN25V15G.

[4] Brian Eyler, How China Turned Off the Tap on the Mekong River, Stimson Center, 13 April 2020, https://www.stimson.org/2020/new-evidence-how-china-turned-off-the-mekong-tap; Facts & Figures: Chesapeake Bay Program, https://www.chesapeake.net/discover/facts.

[5] Eyler, How China Turned Off the Tap on the Mekong River.

[6] Tomoya Onishi and Marimi Kishimoto, Rice Prices Hit 6-year High as Thailand and Vietnam Face Drought, NikkeiAsia, 31 March 2020, https://asia.nikkei.com/Business/Markets/Commodities/Rice-prices-hit-6-year-high-as-Thailand-and-Vietnam-face-drought.

[7] T. Piman and S. Manish, Case Study on Sediment in the Mekong River Basin: Current State and Future Trends, Stockholm Environment Institute, 4 November 2017, https://www.sei.org/publications/sediment-mekong-river.

[8] Mekong River Commission, The Council Study: The Study on Sustainable Management and Development of the Mekong River Including Impacts of Mainstream Hydropower Projects (Phnom Penh: Mekong River Commission, 2017), p. 7, https://mrmekong.org/assets/Publications/Council-Study/Council-study-Reports-discipline/180207-Macroeconomic-Assessment-Report-final-5-MG-2.pdf.

[9] Flood and Drought, Mekong River Commission, https://www.mrmekong.org/topics/floo-and-drought (accessed August 20, 2019).

[10] Mekong River Commission, The Council Study, p 7.

[11] MRC Vietnam Condemns Thai Company’s Contract to Build Xayaburi Dam, Thanh Nien News, 24 April 2012, http://www.thanhniennews.com/politics/mrc-vietnam-condemns-thai-companys-contract-to-build-xayaburi-dam-7641.html.

[12] Thailand Delays Decision on Power Purchase from Pak Beng Dam, Open Development Mekong, 13 March 2018, https://opendevelopmentmekong.net/news/thailand-delays-decision-on-power-purchase-from-pak-beng-dam.

[13] World Bank Group, Lao PDR Economic Monitor: Building a Resilient Health System, June 2020, http://pubdocs.worldbank.org/en/962271591369090988/Lao-Economic-Monitor-June-2020-final.pdf, p 26.

[14] Keith Barney and Kanya Souksakoun, Credit Crunch: Chinese Infrastructure Lending and Lao Sovereign Debt, Asia Pacific Policy Studies, 2021;1–20, https://onlinelibrary.wiley.com/doi/full/10.1002/app5.318.

[15] Zhao and Johnson, Taking Power – Chinese Firm to Run Laos Electric Grid Amid Default Warnings.

[16] Barney and Souksakoun, Credit Crunch: Chinese Infrastructure Lending and Lao Sovereign Debt, p 10.

[17] Barney and Souksakoun, Credit Crunch: Chinese Infrastructure Lending and Lao Sovereign Debt, p 11.

[18] Brian Eyler, Last Days of the Mighty Mekong, Zed Books, 2019, p 220.

[19] Shashank Bengali, ‘No Fish’: How Dams and Climate Change Are Choking Asia’s Great Lake, Los Angeles Times, 20 January 2020, https://www.latimes.com/world-nation/story/2020-01-20/how-climate-change-and-dams-threaten-one-of-the-worlds-great-lakes.

[20] National Heritage Institute, Cambodia (Sambor), December 2017, https://n-h-i.org/programs/restoring-natural-functions-in-developed-river-basins/mekong-river-basin/cambodia-sambor.

[21] Soth Koemseun, Lower Sesan II Dam Opens, Phnom Penh Post, 18 December 2018, https://www.phnompenhpost.com/national/lower-sesan-ii-dam-opens.

[22] Phak Seangly and Daphne Chen, Seasan Dam Goes Online, while PM Dismisses Environmental Concerns, 26 September 2017, https://www.phnompenhpost.com/national/sesan-dam-goes-online-while-pm-dismisses-environmental-concerns.

[23] Guy Ziv, Eric Baran, So Nam, Ignacio Rodriguez-Iturbe and Simon A. Levin, Trading-off Fish Biodiversity, Food Security, and Hydropower in the Mekong River Basin, Proceedings of the National Academy of Sciences of the United States of America, 10 April 2012, https://www.pnas.org/content/109/15/5609.

[24] National Heritage Institute, Cambodia (Sambor), December 2017.

[25] Andrew Stone, Chinese Firm Fails to Convince Locals Over Mekong Blasting, The Third Pole, 29 January 2019, https://www.thethirdpole.net/en/regional-cooperation/mekong-blasting.

[26] Michael Sullivan, China Reshapes The Vital Mekong River to Power Its Expansion, National Public Radio, 6 October 2018, https://www.npr.org/2018/10/06/639280566/china-reshapes-the-vital-mekong-river-to-power-its-expansion.

[27] Mekong: Climate Change Adaptation Strategy and Action Plan, Mekong River Commission, November 2017, p 19, http://mrcmekong.org/assets/Publications/MASAP-book-28-Aug 18.pdf; Peter T. Adamson, Ian D. Rutherford, Murray C. Pell and Iwona A. Conlan, The Hydrology of the Mekong River, The Mekong River, pp 53-76, 2009, https://www.researchgate.net/publication/279971517_The_Hydrology_of_the_Mekong_River.

[28] Short Technical Note: Mekong Sediment From the Mekong River Commission Study, p. 8, https://www.mrcmekong.org/assets/Publications/Mekong-sediment-from-the-MRC-Council-Study-Technical-notedocx.pdf.

[29] The Council Study: The Study on the Sustainable Management and Development of the Mekong River Basin, Including Impacts of Mainstream Hydropower Projects (Final Report), Mekong River Commission, December 2017, https://www.mrcmekong.org/assets/Publications/Council-Study/Macro-economic-assessment-report_Council-Study.pdf. see also https://www.researchgate.net/publication/279971517_The_Hydrology_of_the_Mekong_River.

ISEAS Perspective is published electronically by: ISEAS – Yusof Ishak Institute   30 Heng Mui Keng Terrace Singapore 119614 Main Tel: (65) 6778 0955 Main Fax: (65) 6778 1735   Get Involved with ISEAS. Please click here: /supportISEAS – Yusof Ishak Institute accepts no responsibility for facts presented and views expressed.   Responsibility rests exclusively with the individual author or authors. No part of this publication may be reproduced in any form without permission.   © Copyright is held by the author or authors of each article.Editorial Chairman: Choi Shing Kwok  
Editorial Advisor: Tan Chin Tiong  
Managing Editor: Ooi Kee Beng  
Editors: William Choong, Malcolm Cook, Lee Poh Onn, and Ng Kah Meng  
Comments are welcome and may be sent to the author(s).

Download PDF Version